Every Unit Put Through 10 Tests Before Dispatch

Quality is not negotiable. Every transformer, reactor, and choke that leaves our facility is tested through a complete 10-test battery. A full test report with measured values is included with every unit.

Open Circuit Voltage Test

Verifies turn ratio and output voltage accuracy under no-load conditions.

THRESHOLD

Output voltage within ±2% of specification

Short Circuit Test

Measures winding impedance and copper loss under short circuit conditions.

THRESHOLD

Impedance measured and recorded for reference

No-Load Current Test

Measures core magnetising current to verify core quality and winding integrity.

THRESHOLD

No-load current within design limits

No-Load Temperature Test (10 Hours)

Continuous no-load operation for 10 hours with temperature measurement.

THRESHOLD

50°C to 55°C temperature rise above ambient

Full Load Temperature Test (10 Hours)

Continuous full load operation for 10 hours with temperature measurement.

THRESHOLD

80°C to 90°C temperature rise above ambient

High Voltage Test

Applied voltage test between primary, secondary, and frame to verify insulation integrity.

THRESHOLD

2KV-5KV applied for 1 minute, no breakdown

Insulation Resistance Test (Megger)

DC insulation resistance measurement between all windings and frame.

THRESHOLD

Minimum 1000 MΩ at 2500V DC

Conductor Wire Insulation Test

Verification of conductor wire insulation integrity.

THRESHOLD

Conductor insulation meets Class F specification

Conductor Insulation Class Verification

Confirmation that conductor insulation is rated for Class F operation (160°C).

THRESHOLD

Class F insulation verified

Core Lamination Grade & Watt Loss Test

Core material verification and no-load watt loss measurement.

THRESHOLD

50-500 Grade CRGO/CRNO, 1-4.5 W/kg watt loss

Standard Build Parameters

HIGH VOLTAGE TEST2KV-5KV
MEGGER TEST1000 MΩ / 2500V
NO-LOAD TEMP (10 HRS)50°C TO 55°C
LOAD TEMP (10 HRS)80°C TO 90°C
CONDUCTOR INSULATION160°C
INSULATION CLASSCLASS F
CORE GRADE50-500 Grade
CORE WATT LOSS1-4.5 W/kg

The Testing Process

Every transformer undergoes the full 10-test battery immediately after fabrication and assembly. The no-load and full load temperature tests each run for a continuous 10-hour cycle with periodic temperature measurements recorded. Units that do not meet all test thresholds are rewound or rebuilt before retesting.

The complete test report — including all measured values, test date, technician signature, and unit serial number — is printed and included with the transformer at dispatch. This report serves as your permanent quality record and is required for warranty claims.

We also maintain internal test records for every unit built, indexed by serial number. If you need a duplicate test report or have questions about a unit's test results, contact us with the serial number and we will retrieve the original test data.

Request a Fully Tested Transformer

Every unit we build passes the full 10-test battery before it ships. Send us your specifications and we will build it right.

REQUEST A QUOTE